26 technical manuals and trades literature reportedly used in the construction and fitting out of Cameron Offices circa 1975.
Available on site at the ACT Heritage Library only.
This collection was donated by the family of Keith White. Mr White was a leading hand working closely with the architect on the building of the Cameron Offices. The material donated was scheduled for disposal. Mr White was permitted to keep the material for himself.
The collection consists of 26 technical manuals and costing books apparently used in the fitout of the Cameron Offices (Series 1 Trade Literature) and 5 albums of photographs of the construction of Cameron Offices 1971-1975 (Series 2 Photographs). There are more than 600 images in the collection.
The five volumes that make up the Photographic Record of Construction Progress contain sets of black and white photographs each with a site plan marked with the positions from where the photographs were taken. Between 8 and 26 photographs were taken each shoot.
To download a pdf of each day's photographs follow the link to the catalogure record and select "access resource" from the right of the screen on the catalogue record.
26 technical manuals and trades literature reportedly used in the construction and fitting out of Cameron Offices circa 1975.
Available on site at the ACT Heritage Library only.
Multiple photographs of construction were taken on a single day in most months from November 1970 to September 1971.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on a single day in most months from November 1970 to September 1971.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on a single day in most months from November 1971 to December 1972, with the exception of January 1972. There is also a group of aerial photographs of the site in this album.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on a single day in most months from November 1971 to December 1972, with the exception of January 1972. There is also a group of aerial photographs of the site in this album.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on a single day in most months between 14 February and 16 November 1973.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on a single day in most months between 8 February 1974 and 20 October 1975.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
Multiple photographs of construction were taken on 26 March 1971 (duplicates from volume 1), 17 March 1976 and 17 September 1976. There are two undated photographs in this volume, circa 1976.
Photographs are cross-referenced to a site plan marked with the positions from where the photographs were taken.
Each image is digitised separately. To retain context and the experience of using the albums, we have created downloadable PDFs for each day's photographs. The tiles are links to the PDF in our catalogue. Within the PDF are links to the high resolution individual image in our catalogue.
The ACT Heritage Library has other resources that document the development of the Cameron Offices. Where possible they are digitised and can be downloaded from the catalogue record.